• Home
    • News
      • What's New
      • New Projects
      • Planning
      • Articles
      • FAQ
    • Projects
      • Luxury Homes
      • Commercial Development
      • Placemaking
      • Visitor Centres
    • Practice
      • Process
      • Who we are
      • Jeremy Humphries
      • Victoria Humphries
      • Quality Policy
      • Recruitment
    • Contact
  • Home
  • News
    • What's New
    • New Projects
    • Planning
    • Articles
    • FAQ
  • Projects
    • Luxury Homes
    • Commercial Development
    • Placemaking
    • Visitor Centres
  • Practice
    • Process
    • Who we are
    • Jeremy Humphries
    • Victoria Humphries
    • Quality Policy
    • Recruitment
  • Contact
  1. Practice
  2. Process

How we help property owners make informed decisions on their self build, renovation, extension or conversion projects

The process we use helps our clients by having clearly defined stages and milestones makes it simpler to agree on deliverables and fees. In addition, our process allows clients to precisely establish the scope of work they require and then effectively monitor the project as it progresses.

draggable-hero color-white g-font has-transparent-header has-btm-arrow

The RIBA Plan of Work

Our process follows the RIBA Plan of Work, which is regarded as the best practice for the design and construction of buildings. The process of briefing, designing, delivering, maintaining, operating and using a building is organised into eight stages.

In our experience, Stage 0 and Stage 1 are the most crucial to the success of any building project, but surprisingly most developments on the Isle of Man – large and small – progress straight to design and sometimes even construction without these stages. 


Stage 0: Strategic Definition

Stage 0 is exploratory. This stage is strategic in nature and where we define the Business Case and Client Requirements. We will explore the best means of achieving your requirements. For domestic and commercial projects, the goal is to establish whether construction or refurbishment of a building is the best way to meet your needs or if there might be a better solution.

is-tile-overlay bg-carrot add-20 mid-round wow animated fadeInUp

Stage 1: Preparation and Briefing

At Stage 1 we will establish whether the scheme is feasible and identify any fundamental problems. Feasibility Studies undertaken at Stage 1 are not the start of the design process but are carried out as part of the briefing process to verify whether a site can accommodate the client’s needs, or to test a particular aspect of the brief, allowing the brief to be changed as required. We will develop a project brief that defines:

 

Project Outcomes
Sustainability Outcomes
Quality Aspirations 
Spatial Requirements
Project Budget

is-tile-overlay bg-pink add-20 mid-round wow animated fadeInUp

Stage 2: Concept Design

At Stage 2 outline drawings will be produced after initial consultations with statutory authorities. Our drawings will seek to interpret the brief and identify a possible architectural solution. The concept design is our initial design response to your project brief. The project brief will continue to develop throughout this stage, and it may be necessary to revise performance targets due to the developing concept design. The project brief will be 'frozen' at the end of this stage.

is-tile-overlay bg-cyan add-20 mid-round wow animated fadeInUp

Stage 3: Spatial Coordination

At Stage 3 we will develop the concept design into a dimensionally correct and coordinated plan, defining all of the main components of the building and how they fit together. The concept design is developed to show the appearance of a building, how fixtures and fittings are incorporated and how essential details of construction work. Your budget will be considered when developing the design information along with previously identified objectives such as quality, long-term maintenance and energy performance.

 

At this stage we will provide information, design and layouts to accompany your application to the local authority for Planning permission. We will consult with specialist subcontractors during this stage to address specific technical aspects of the design that will be developed in the next stage.

 

is-tile-overlay bg-amber add-20 mid-round wow animated fadeInUp

Stage 4: Technical Design

Stage 4 is when we prepare detailed technical information suitable for the Contractor to use in the project's construction. We develop the information required to manufacture and construct the building with the design team and the specialist subcontractors employed by the contractor.

is-tile-overlay bg-green add-20 mid-round wow animated fadeInUp

Stage 5: Manufacturing and Construction

At Stage 5, we administer the Construction Contract and make site inspections to ensure that the Contractor follows the drawings and specifications, work completed is of a proper standard, and that staged payments to the Contractor are correctly certified.

 

We make routine site visits to inspect the work's general progress, issue instructions to the Contractor, and, if necessary, reject unsatisfactory work. 

 

We will report to you on matters of progress, any unforeseen circumstances on site, and any variations in budget or programme. We will issue periodic certificates for stage payments due to the Contractor.

is-tile-overlay bg-wisteria add-20 mid-round wow animated fadeInUp
is-tile-overlay bg-amethyst add-20 mid-round wow animated fadeInUp
has-link-bounced

Stage 6: Handover

As your Contract Administrator, we will conclude all aspects of the Building Contract, including the inspection of defects as they are rectified and the production of certification required under the Building Contract. 

 

We take a percentage off each payment for you to hold on to for a year after the construction of your project. This ensures that after the builder has left the site, they're incentivised to come back and correct any problems. We will release the retention sum and finalise the construction contract at this stage. 

is-tile-overlay bg-sun-flower add-20 mid-round wow animated fadeInUp
is-tile-overlay bg-yellow add-20 mid-round wow animated fadeInUp
has-link-bounced

Stage 7: In Use

On most projects, we will have no Stage 7 duties to undertake. However, we can provide advice post-construction concerning the following:

 

Letting.
Rating.
Maintenance.
Energy consumption and energy certificates.
Insurance.
Tenants queries.
Facilities management.
The preparation of tender documents for maintenance and operation contracts.
Post occupancy evaluation.
Facilities management.

is-tile-overlay bg-blue add-20 mid-round wow animated fadeInUp
is-tile-overlay bg-blue add-20 mid-round wow animated fadeInUp
has-link-bounced

To discuss a project or find out more about how we can work together, please send us as much information about you and your project as possible. We will call you to arrange a full consultation.

Contact Us

Please enter the code:

Note: Please fill out the fields marked with an asterisk.


STAY IN TOUCH

CONTACT US

01624 825852

FAQ

Practice

Process

Latest news

Projects

About us

OUR QUALITY STATEMENT

OUR POSTAL ADDRESS

MODUS ARCHITECTS LTD

PO Box 2

Castletown

Isle of Man

IM99 5DJ


has-link-fromleft

© Modus Architects Limited 2022. All rights reserved. Modus Architects Limited is registered in the Isle of Man No. 130736C  VAT No.004666001 reg. office: PO Box 2, Castletown. Isle of Man. IM99 5DJ

 Director: Jeremy Humphries Architect, Royal Institute of British Architects. Director: Victoria Humphries Artist, BA (Hons)

draggable-logo

About | Privacy Policy | Sitemap
Modus Architects Ltd. 2021
Log out | Edit
  • Process
  • Who we are
  • Jeremy Humphries
  • Victoria Humphries
  • Quality Policy
  • Recruitment
  • Scroll to top